EST. 1984

The Process Continued

6.Once the installers arrive the tear-out process begins. This includes removal of your old doors, drawers and countertops.
7. Since our frames are already assembled and finished attaching them is as simple as nailing them on (from the inside). No other prep work is needed.
8. Side panels, bottom panels and moldings are also nailed on.
9. New drawers with drawer slides are installed.
10. Attaching new doors, drawer fronts, hardware and countertops completes the project.

Back

 


©2007 THE WOODWORKS